Improvement Notices to Mills


Member mills are invited to provide short descriptions of improvement notices issued and actions taken resulting from the notices. This information is intended to provide industry wide benefits and learning from these notices.

Improvement/prohibition Action
Provide formal training and documented procedures for loco crews in emergency stopping procedures Procedures developed and am happy to share on request (Mulgrave Mill)
Provide safe access for workers to the top of brake vans Handrails added
Provide trackside signage to enforce the call point system for loco operators Done
All controls in locos to be clearly marked to ensure safe identification by operators Done
Guarding to be installed on locos to prevent loco operators coming into contact with side rods Solutions vary from loco to loco but essentially mill has installed guarding in and around the cabin access stairs
Vigilance system to be installed on all locos Agreed with WH&SQ to deal with one loco per year until completed given the significant costs involved
Speed meters to be installed on the locos Done
Speed limits to be set for all relevant areas and signed accordingly Done
Emergency procedures for the cane rail system are developed, documented and published in locos, with all employees trained Done
A competent person should assess maximum trailing loads for all locos and a report available for inspection by WHS Inspectors Done
Establish a mimic board or like system to cover failure of GPS system. Done

Content

23-04-2013 Burdekin Cane Supply and Transport (4) Download >
23-04-2013 Burdekin Cane Supply and Transport (3) Download >
23-04-2013 Burdekin Cane Supply and Transport (2) Download >
23-04-2013 Burdekin Cane Supply and Transport (1) Download >
07-03-2013 MS_2012_Prohibition Notice_operating powered mobile plant without clear line of sight Download >
07-03-2013 MS_2012_Improvement notice_following collision of locos Download >